remote host : EP Facility OperationWhat is STF?
Progress So Far
The STF Phase-1 consisted operation of two units of 4-cavity
cryomodules each containing up to 4 units of 9-cell cavities of
so-called "TESLA-like design" and "Low-loss design". An extensive set
of research infrastructure has been also built during the STF
Phase-1. The program of STF Phase-1 completed at the end of March,
2009, and a report has been publised as KEK-2009-3 (Japanese
only).
Forthcoming ActivitiesThe forthcoming activities at STF involve continued development and operation of the research infrastructure such as electro-polishing and vertical testing of 9-cell cavities, and construction and operation of linac units based on superconducting cavity technologies. The latter will proceed in three steps: "S1-global", "Quantum-beam R&D" and "STF Phase-2". The S1-global (operation planned for CY2010) is a program in which up to eight cavities from not only Japan but also from Europe and Americas are to be installed in cryostats and to be concurrently operated with pulsed RF. The main theme of this exercise is to accumulate experiences on dealing with cavity components from different areas, who in principle abide by the same design principle but would adopt slightly varying design implementations (plug-compatibility).
The quantum beam project (operation planned for CY2012) is a project in which a prototype test is performed on a compact X-ray source on the basis of Compton scattering of laser light by a high-qulity, high-intensity beam from a superconducting linac.
The STF Phase-2 (initial operation planned for CY2013) is an experiment to build and operate a fully equipped one RF unit for the main linacs as currently conceived for ILC.