ILC-Asia Logo

STF

Asian Regional Team for Linear Collider Accelerator Development

KEK | KEK Home | KEK Acc. Lab. | GDE (ILC-World) | ILC-Asia Accelerator | ILC-Asia Physics
Overview
    Introduction (J)
    Introduction (E)
    What's New
    RSS Feed  RSS feed
LC Office
  Admin (J)
  Admin (E)
  Japanese Newsletter
GDE and RD
    SB2009
    TDP NEW!
    EMO/EDMS
    IDAG
    RDR
Research Activities
    ILC-Asia, WGs
    Visitors
    SC-RF
    Conv. Facilities
Meetings / Forums
    Local Meetings
    Regional Mtgs
    Internat'l Mtgs
    Mailing Lists
Test Facilities
    ATF
    ATF2
    STF
Library
    ILC-Asia Notes
    Photos
    Conferences
    References
    Lectures
    Reviews
    Reports
    Workshops
    KEK LC Proj. Comm.
Additional Resources
    World Efforts
    ILC Newsline (J)
    Useful Links
    Old News
Legacy Links




Contact the to send your comments, suggestions, broken links, and link requests.

Valid HTML 4.01!
[Valid RSS]

.

Recent Publication

Regular Meetings

S1-Global Experiment

EP Facility Operation

What is STF?

STF is a project at KEK to build and operate a test linac with high-gradient superconducting cavities, as a prototype of the main linac systems for ILC. The initial primary goal of this project is to establish a facility where domestic and regional development activities for superconducting RF (SRF) technologies are to be based.

STF building
STF was built within an existing building on KEK Tsukuba campus. which had been used by the J-PARC group till Winter, 2005.



STF layout

Progress So Far

The STF Phase-1 consisted operation of two units of 4-cavity cryomodules each containing up to 4 units of 9-cell cavities of so-called "TESLA-like design" and "Low-loss design". An extensive set of research infrastructure has been also built during the STF Phase-1. The program of STF Phase-1 completed at the end of March, 2009, and a report has been publised as KEK-2009-3 (Japanese only). NEW!

STF schedule

STF schedule

Forthcoming Activities

The forthcoming activities at STF involve continued development and operation of the research infrastructure such as electro-polishing and vertical testing of 9-cell cavities, and construction and operation of linac units based on superconducting cavity technologies. The latter will proceed in three steps: "S1-global", "Quantum-beam R&D" and "STF Phase-2".

The S1-global (operation planned for CY2010) is a program in which up to eight cavities from not only Japan but also from Europe and Americas are to be installed in cryostats and to be concurrently operated with pulsed RF. The main theme of this exercise is to accumulate experiences on dealing with cavity components from different areas, who in principle abide by the same design principle but would adopt slightly varying design implementations (plug-compatibility).

S1Global

The quantum beam project (operation planned for CY2012) is a project in which a prototype test is performed on a compact X-ray source on the basis of Compton scattering of laser light by a high-qulity, high-intensity beam from a superconducting linac.

Quantum Beam

The STF Phase-2 (initial operation planned for CY2013) is an experiment to build and operate a fully equipped one RF unit for the main linacs as currently conceived for ILC.

Quantum Beam

Reference Information

STF Installation Photo Diary