KEK-SLAC ISG4 Meeting (July, 1999 at KEK)
[(J)LC Accelerator Home Page | General Info on KEK-SLAC ISG ]
Information
ISG Progress Report
One of the important tasks at ISG4 is to start preparation of the ISG Progress Report which summarizes the activities and outcome of the work that was done through KEK-SLAC ISG.
Summary Presentions
Copies of the transparencies presented at the WG summary reports are available in PDF file format below. The transparency images were scanned at a resolution of 600 DPI (or less). FTP download the files with binary transfer
enabled, and use Acrobat 3 for viewing or printing. Some pages are hard to read online. Print out with laser writers should come out fairly legible, however.
Summary Reports on Day 2 AM (July 20, 1999)
- WG1 (Parameters)
- WG2 (Injector / ATF)
- WG3 (Accelerating Structure)
- WG4 (Klystron Modulator)
- Remarks from the ISG Progress Report Editor Group.
Summary Reports on Day 3 AM (July 21, 1999)
- WG2 (Injector / ATF)
- WG4 (Klystron Modulator)
Final Summary Reports on Day 4 (July 22, 1999)
WG Parallel Session Presentations
This area is under construction as of August 18, 1999.
Links will be incorporated whenever a new scan becomes available.
WG1+WG3
WG2
WG2 - Special ATF Session
WG3
WG3 + WG5
WG4
- Solid State Induction Modulator (A. Donaldson, July 19, AM)
- Baseline Modulator (Saul Gold, July 19, AM)
- Solid State Thyratron Replacement (Mitsuo Akemoto, July 19, PM)
- Hybrid Modulator Design (Saul Gold, July 19, 14:30)
- Klystron Protection on Internal Arcs (Saul Gold, July 19, PM)
- S- and L-band Modulators (Saul Gold, July 19, 16:00)
WG5
- X-band Klystron: Status and Plan at KEK (Yong Ho Chin, July 19, AM)
- Gun Design Status for Toshiba PPM Klystron (Shuji Matsumoto, July 19, AM)
- Design of the Beam-Cavity Interaction Part for Toshiba PPM Klystron (Shuji Matsumoto, July 19, AM)
- PPM Magnetic Circuit Prototype and Measurements (Keiji Ohya, July 19)
- Performance Testing Results of XB72K #10 (Shuji Matsumoto, July 19, AM)
- Rebuilding of BINP PPM (Yong Ho Chin, July 19, PM)
- High-power Test Results of Kazakov Window (Seiya Yamaguchi, July 19, PM)
- Multi-mode DLDS: Present Status and Plan (Yong Ho Chin, July 20, AM)
- Waveguide Installation for DLDS Testing at ATF Linac Housing (Hitoshi Hayano, July 20, PM)
- Measurement Results on Dual-mode DLDS Basic Units (Seiya Yamaguchi, July 20, PM)
- Recent Development of High-power Components at SLAC (Sami Tantawi, July 21, AM)
- Mode-Stability Experiment (Sami Tantawi, July 21, AM)
- Status of High-Power Semiconductor RF Switches (Fumihiko Tamura and Sami Tantawi, July 21, AM)
WG6
toge@lcdev.kek.jp
Last modified: Thu Jul 28 13:46:54 JST 2005