The KEK-SLAC ISG was formed in 1998, based on a Memorandum of Understanding between SLAC and KEK on development of Linear Colliders, which utilizes room-temperature RF technologies for the main linacs.
The text of the KEK-SLAC MOU is available here (A PDF file that should be downloaded in the binary transfer mode, and be viewed by using Acrobat Reader version 3.0 or higher)..
ISG1, January, 1998, SLAC.
ISG2, July, 1998, KEK.
ISG3, January, 1999, SLAC.
ISG4, July, 1999, KEK.
ISG5, February, 2000, SLAC.
ISG6, November, 2000, KEK.
ISG7, November, 2001, KEK.
ISG8, June, 2002, SLAC
ISG9, December, 2002, KEK.
ISG10, June, 2003, SLAC
ISG11, December, 2003, KEK.
ISG Progress Report (KEK Report 2000-7, SLAC-R-559) is a report on the activities of the ISG. It presents the progress that has been made over the past several years as of April, 2000. The report is electronically available as follows:
|
|
pdf (http) |
| Cover page | |
| Table of contents | |
| Preface and Acknowledgement | |
| Chapter 1. Introduction and Summary | |
| Chapter 2. Accelerator Parameters | |
| Chapter 3. Injection Systems | |
| Chapter 4. Klystron Modulator | |
| Chapter 5. X-band RF Power Sources | |
| Chapter 6. RF Pulse Compression and Distribution Systems | |
| Chapter 7. Accelerating Structure | |
| Chapter 8. Collimation, Final Focus and Interaction Region | |
| Appendices | |
|
|
|