Contact the
to send your comments, suggestions, broken links, and
link requests.
.
|
| ID
| Title
| Author
| Date
|
| 2007-02
| Estimation of Transient Lorentz Detuning of ICHIRO Cavity...
| T.Higo
| Sep. 17, 2007
|
| 2007-01
| SEM Inspection of HPR Nozzles of Four Labs for SC LC
| T.Higo
| April 26, 2007
|
| ID
| Title
| Author
| Date
|
| 2006-07
| Change of Periphery Shape Characteristics of
SUS Nozzle Holes for HPR at KEK and Nomura
| T.Higo
| December 4, 2006
|
| 2006-06A
| Simulation of Low Emittance Transport in Long straight Line of ILC RTML
| K.Kubo
| Revised: October 20, 2006
|
| 2006-05
| Rough Estimation of effects of Fast-Changing Stray Fieldd in Long
Transport of RTML
| K.Kubo
| October 12, 2006
|
| 2006-04
| Simulation of DFS (Dispersion Free Steering) using SLEPT
| K.Kubo
| October 12, 2006
|
| 2006-03
| Timing Constraints on ILC
| M.Kuriki et al
| August 2, 2006
|
| 2006-02
| Damage Test for ILC Positron Generation
Target at KEKB
| M.Kuriki et al
| March 19, 2006
|
| 2006-01
| Estimation of Lorenz Detuning and Related
Tuning Characteristics of ICHIRO Cavity
| T.Higo et al
| May 8, 2006
|
| ID
| Title
| Author
| Date
|
| 2005-26
| ATF2 Proposal (Volume 2)
| ATF2 Team
| Feb. 13, 2006
|
| 2005-25
| Beam Dynamics in Curved ILC Linacs
| K.Kubo
| Dec. 22, 2005
|
| 2005-24
| Studies of Electron Cloud, Ion Effects ...
for KEKB, Super-KEKB and ILC DRs
| Frank Zimmermann (CERN)
| November 26, 2005
|
| 2005-23
| Beam Dynamics in Curved ILC Linacs
| K.Kubo
| Rev. Dec. 1, 2005
|
| 2005-22
| ATF2 Proposal (Volume 1)
| ATF2 Team
| August 11, 2005
|
| 2005-21
| Damping Wiggler Study at KEK-ATF
| T.Naito, et al
| July 18, 2005
|
| 2005-20
| ILC Conventional Facility Studies (Draft 5)
| KEK CF Team
| August 13, 2005
|
| 2005-19
| For Estimation of Effects of Long-Range
Wakefield in ILC Main Linacs
| K.Kubo
| July 15, 2005
|
| 2005-18
| Main Linac Simulation -- Main Linac Alignment
Tolerances from Single-bunch Effect
| K.Kubo
| June 22, 2005
|
| 2005-17
| Tolerances of Misalignment of Quads and Cavities
of ILC Main Linacs
| K.Kubo
| May 16, 2005
|
| 2005-16
| New Design for a SC Cavity Input Coupler
| H.Matsumoto, S.Kazakov and K.Saito
| July 18, 2005
|
| 2005-15
| Progress and Plans for R&D and the Conceptual
Design of the ILC Main Linacs
| H.Hayano
| July 18, 2005
|
| 2005-14
| High Power Test of the Prototype Cryomodule for ADS
Superconducting Linac
| E.Kako et al
| July 18, 2005
|
| 2005-13
| Results from DR and Instrumentation Facilities
| J.Urakawa
| July 18, 2005
|
| 2005-12
| Possibility of Noninvasive Micron High-Energy
Electron Beam Size Measurement Using Diffraction Radiation
| G.Naumenko et al
| July 18, 2005
|
| 2005-11
| Simulation Study of a Dogbone Damping Ring
| Y.Ohnishi and K.Oide
| July 18, 2005
|
| 2005-10
| Proposal of the Next Incarnation of ATF for ILC
| S.Araki, et al
| July 18, 2005
|
| 2005-09
| RF Sources of Superconducting Test Facility (STF) at KEK
| S.Fukuda, et al
| July 18, 2005
|
| 2005-08
| Tolerances of Misalignmant of Quads and Cavities of ILC Main Linac
| K.Kubo
| May 16, 2005
|
| 2005-07
| WG5 (High Gradient Cavities) Status
| K.Saito
| Apr. 18, 2005
|
| 2005-06
| WG4 (BDS, FFS, MDI) Status
| T.Sanuki
| Apr. 18, 2005
|
| 2005-05
| WG3 (Injectors) Status
| M.Kuriki
| Apr. 18, 2005
|
| 2005-04
| STF Status
| H.Hayano
| Apr. 18, 2005
|
| 2005-03
| WG1 (Overall Design) Status
| K.Kubo
| Apr. 18, 2005
|
| 2005-02
| LC Group Status Review
| K.Yokoya
| Apr. 18, 2005
|
| 2005-01
| Emittance Dilution at ILC Main Linac
| K.Kubo
| Mar. 25, 2005
|
| ID
| Title
| Author
| Date
|
| 2004-07
| ILC Development in Asia
| K.Yokoya
| Dec. 20, 2004
|
| 2004-06
| Asian Plan for ILC Development
| Y.Totsuka
| Dec. 22, 2004
|
| 2004-05
| Construction of STF
| H.Hayano
| Dec. 12, 2004
|
| 2004-04
| Injector Issues for SC-LC
| J.Urakawa
| Sep. 7, 2004
|
| 2004-03
| Introduction to SRF Cavity
| K.Saito
| Sep. 7, 2004
|
| 2004-02
| Introduction to TESLA RF System
| H.Hayano
| Sep. 7, 2004
|
| 2004-01
| An Overview of a SC-LC
| K.Yokoya
| Sep. 7, 2004
|
|