Contact the
to send your comments, suggestions, broken links, and
link requests.
.
|
Announcement
Thursday, January 19, 2005
General
Damping Ring and Sources
Machine Layout
Friday, January 20, 2006
Main Linac Unit
General
Supplementary Notes
Post-Meeting Memos
- Meeting Discussion Memo
(DRAFT v.0.6, MSWord 170kB, Updated 2006/1/26)
-
Annoucement of the Next Meeting, FNAL, February, 2006
(EC, PDF 11kB, 2006/1/21)
-
ILC BCD Beamline Descriptions Memo (EC, PDF 164kB, 2006/1/21)
-
ILC BCD Beamline Descriptions Memo (with DR updates)
(A.Wolski, MSWord 242kB, 2006/1/25)
Participants
Physically at KEK
- EC: B.Barish, G.Dugan, T.Raubenheimer, N.Walker,
F.Takasaki, K.Yokoya
- Europe: S.Guiducci, W.Bialowons
- America: J.Sheppard,
C.Adolphsen, A.Seryi, P.Tenenbaum, A.Wolski,
P.Garbincius, A.Brachmann
- Asia: E.S.Kim, T.Shidara, M.Kuriki, H.Hayano,
N.Toge, Hitoshi Yamamoto, K.Kubo, J.Urakawa, S.Fukuda,
R.Sugahara, T.Omori, K.Ohmi, S.Kuroda, K.Ohnishi, M.Kumada,
K.Saito, S.Michizono, T.Higo, S.Noguchi, M.Tanaka,
N.Terunuma
Via Video Link
- Y.Iwashita (Kyoto), L.Lilje (DESY), N.Solyak (FNAL)
Via Telephone
- D.Angal-Kalinin (Daresbury), S.Mishra (FNAL)
Instructions on Video Connection
The video link will be made through KEK MCU server. If your terminal
has been registered as a permitted terminal for the KEK gate keeper,
please just
- Call 52001.
The connection will be establshed. The KEK gate keeper (130.87.34.42)
has to be set at your terminal.
If your terminal is not registered at all, please follow these steps,
- Call 81-29-877-1214 through ISDN line. A guidance will be anounced.
- Please type "52001".
- If it does not work, please try "#52001#".
- Connection to the conference is established.
In case of difficulties, please,
|