ILC-Asia Logo

Welcome to ILC-Asia

Asian Regional Team for ILC Accelerator Development

KEK | KEK Home | KEK Acc. Lab. | GDE (ILC-World) | ILC-Asia Accelerator | ILC-Asia Physics
Overview
    Introduction (J)
    Introduction (E)
    What's New
    RSS Feed  RSS feed
LC Office
  Admin (J)
  Admin (E)
  Japanese Newsletter
GDE and RD
    SB2009
    TDP NEW!
    EMO/EDMS
    IDAG
    RDR
Research Activities
    ILC-Asia, WGs
    Visitors
    SC-RF
    Conv. Facilities
Meetings / Forums
    Local Meetings
    Regional Mtgs
    Internat'l Mtgs
    Mailing Lists
Test Facilities
    ATF
    ATF2
    STF
Library
    ILC-Asia Notes
    Photos
    Conferences
    References
    Lectures
    Reviews
    Reports
    Workshops
    KEK LC Proj. Comm.
Additional Resources
    World Efforts
    ILC Newsline (J)
    Useful Links
    Old News
Legacy Links




Contact the to send your comments, suggestions, broken links, and link requests.

Valid HTML 4.01!
[Valid RSS]

.





20100412Di-0192m.jpg

20100412Di-0080m.jpg 20100412Di-0018m.jpg

20100412Di-014752n.jpg

Cavity Production Pilot Plant under construction. It is being built inside a clean room area of approximately 14 m x 19 m, created within the former PS Energy Center which was refurbished in 2009. It will feature a press machine with a capacity of 150t, a cell trimming machine based on a CNC lathe, a set of equipment for chemical polishing, an electron beam welding machine and associated hardware. As of April 2010, the clean room floor is basically ready and a lathe and a press machine have been installed. An EBW machine will be installed in early Spring of 2011.


Archives of the images from the past top pages.
Last modified: Wed Apr 14 21:04:45 JST 2010