ILC-Asia Logo

ATF2

Asian Regional Team for Linear Collider Accelerator Development

KEK | KEK Home | KEK Acc. Lab. | GDE (ILC-World) | ILC-Asia Accelerator | ILC-Asia Physics
Overview
    Introduction (J)
    Introduction (E)
    What's New
    RSS Feed  RSS feed
LC Office
  Admin (J)
  Admin (E)
  Japanese Newsletter
GDE and RD
    SB2009
    TDP NEW!
    EMO/EDMS
    IDAG
    RDR
Research Activities
    ILC-Asia, WGs
    Visitors
    SC-RF
    Conv. Facilities
Meetings / Forums
    Local Meetings
    Regional Mtgs
    Internat'l Mtgs
    Mailing Lists
Test Facilities
    ATF
    ATF2
    STF
Calendar
    Events
Library
    ILC-Asia Notes
    Photos
    Conferences
    References
    Lectures
    Reviews
    Reports
    Workshops
    KEK LC Proj. Comm.
Additional Resources
    World Efforts
    ILC Newsline (J)
    Useful Links
    Old News
Legacy Links




Contact the to send your comments, suggestions, broken links, and link requests.

Valid HTML 4.01!
[Valid RSS]

.

What is it?

ATF2 is an international project to build and operate a test facility for the final focus system that is envisaged at ILC. The primary project goal is to establish the hardware and beam handling technologies pertaining to transverse focussing of the electron beams to nearly 40nm.

The emphasis of the effort will be on repeatable, stable operation of this beam manipulation to the level which can be readily applied to physics runs of ILC.

ATF2 will be built on KEK Tsukuba campus as an extension of the existing ATF. The ATF, which has a world record of the normalized emittance (the smaller, the better) of 3 x 10^-8 m, will provide the beam with ATF2.

ATF2 layout

How is it proceeding?

A two-volume set of the design proposal report have been published in 2005 and 2006. Construction of components has started in 2005, and an initial beam operation is expected in 2008.

Reference information

Workshop Meetings for ATF2

Related Images

Last modified: Fri Oct 17 23:26:23 JST 2008